- Commercial, Commercial Landlords, Office Fit Outs
105 Piccadilly
Preserving legacy
Modernising 105 Piccadilly: Rejuvenating two floors of historic Grade II listed office space to create an inspirational yet practical working environment.
Location: Piccadilly, London
Size: 7,000 sq ft
Project Type: Landlord Fit Out
Duration: 12 weeks
Blending prestige and heritage with excellence
Having previously successfully delivered prestigious office fit-outs for our client, Motcomb Estates, including Connaught House and Clareville House, we were entrusted to complete a CAT A office fit out of the third and fifth floors at 105 Piccadilly. What truly distinguishes this undertaking is the Grade II listed status of the building, recognised as being of ‘special interest.’ Our primary focus was the meticulous preservation of its historical features, an endeavour that demanded careful consideration to honour the building’s rich history and effectively convey its narrative throughout the fit-out process. Leveraging our extensive experience in heritage fit-outs, our highly skilled team embarked on the mission to modernise 105 Piccadilly while maintaining utmost respect for its historical significance.
Survey exposes compliance issues
Tasked with the mission to enhance the office space to attract a prospective tenant, our team began the project with a comprehensive survey, which later revealed that the prior renovation work conducted at 105 Piccadilly fell short of meeting the prevailing fire safety building regulations. More specifically, the survey identified a non-compliance in the fire separation system – a crucial measure designed to create distinct sections within a building, acting as a passive fire protection system. This discovery prompted us to reassess the project scope in order to ensure the space adhered to the highest standards of safety and compliance.
Space planning showcases potential
As part of our work at 105 Piccadilly, our expert team generated a detailed general arrangement plan, also known as a space plan. This visual representation aimed to exhibit the potential of the renovated workspace to potential tenants. With a keen understanding of maximising space utility, our in-house Project Manager and Project Designer collaborated to produce a 2D space plan. This plan was designed to help future occupants visualise how they could effectively utilise the space for enhanced team collaboration and productivity. The plan included features such as open collaborative areas, strategically located meeting rooms, communal dining spaces, desk-sharing concepts, innovative office furniture ideas, and much more.
Testimonial
What the client said
“Their team provided strong leadership, good technical and problem solving know-how and excellent site supervision. Imperial has some excellent added value services, they were able to deal with Building Control quickly and easily through their supply chain.”
Tom Gordon, MRICS, Director, TAG Surveying
Case studies
Explore more of our work
Location: Ealing Cross, London
Size: 4,000 sq ft
Project Type: Tenant Fit Out
Duration: 6 Weeks
Location: Kings Cross, London
Size: 5000sqft
Project Type: Tenant Fit Out
Duration: 12 Weeks
Location: 1st 4th and 5th Floor, 72–74 Cannon Street, London EC4
Size: 5,000 sq ft
Project Type: Landlord Fit Out
Duration: 10 weeks
Location: Moorgate, London
Size: 3,700 sq ft
Project Type: Tenant Fit Out
Duration: 6 week project
Location: Farringdon, London
Size: 10,000 sq ft split over 5 floors
Project Type: Tenant Fit Out
Duration: 8 week project in 4 phases to accommodate all employees
Location: Clerkenwell, London
Size: 4055 sq ft
Project Type: Tenant Fit Out
Duration: 6 weeks