- Commercial, Retail Fit Out
Material Lab
Fit out of a showroom in a prime central London location, acting as principle contractor for the entire project.
Location: Fitzrovia, London
Size: 5,000 sq ft
Project Type: Tenant Fit Out
Duration: 8 weeks
Testimonial
What the client said
Material Lab based in Mayfair London has been at the heart of the design community for over 10 years. When the time came for a complete refit in 2017 we entered into a lengthy design and tender process. After reviewing all of our needs, some of which were very specific and required an understanding of detail and quality of finish, we appointed Imperial Building solutions as our main contractor. Having personally overseen numerous projects of this type, It’s fantastic and a relief when you ‘hit gold’ when appointing your main contractor – Imperial are just that. From start to finish, rip out through to finishing touches the attention to detail was always there. Delivered on time and budget by a great company, run by a team of professionals. (And on a personal level, seriously great guys too!) The next time we refit, one name will be on the list to start with – Imperial Building Solutions.
Darren Clanford, Creative Director
Material Lab London
Case studies
Explore more of our work
Location: Ealing Cross, London
Size: 4,000 sq ft
Project Type: Tenant Fit Out
Duration: 6 Weeks
Location: Kings Cross, London
Size: 5000sqft
Project Type: Tenant Fit Out
Duration: 12 Weeks
Location: 1st 4th and 5th Floor, 72–74 Cannon Street, London EC4
Size: 5,000 sq ft
Project Type: Landlord Fit Out
Duration: 10 weeks
Location: Moorgate, London
Size: 3,700 sq ft
Project Type: Tenant Fit Out
Duration: 6 week project
Location: Farringdon, London
Size: 10,000 sq ft split over 5 floors
Project Type: Tenant Fit Out
Duration: 8 week project in 4 phases to accommodate all employees
Location: Clerkenwell, London
Size: 4055 sq ft
Project Type: Tenant Fit Out
Duration: 6 weeks